
Milestone 0
Project Summary
-
Part of an Engineering design team that contributes to green technology.
-
Focus on designing a turbine blade component.
-
Three levels of design process
-
Learn about design specifications
-
Select suitable materials
-
Develop design embodiment through CAD modelling
Project Details
-
Assigned Scenario - ' A Rooftop Generator'
-
Project Duration - 4 weeks (September 24, 2020 to October 28, 2020)
-
Administrative Role - Subject Matter Expert
Design a suitable wind turbine that can be installed on most residential housing roofs for homeowners that want to reduce their electricity bills.
Tools Used
The tools used for this project included ANSYS-Granta EduPack for material selection and Autodesk Inventor for CAD modelling.
More
Each Engineering Design team was required to contribute to renewable energy by focusing on designing a turbine blade component inside a wind turbine, by considering its mechanical properties and performance.
